How to manage a project with multiple connection points

When designing a project in which you have several connection points and therefore several consumption files, you have two options:

  1. Create a project for each connection point. This is the recommended option as you can have different settings and consumption files in each project.

  1. Have a single project with several proposals. To do this you must generate a proposal for each different connection point by changing the consumption file and settings in each iteration.

WARNING

Note that each project can have only one consumption file associated with it, which will be the last uploaded consumption file. This means that if you upload a previous proposal created with a different consumption file, the file you will find will be the last uploaded one and not the one used for the proposal you uploaded.