Grant

It is important to consider how a grant influences the technical-economic study of the feasibility of your projects. You can define the characteristics of the grant in the cost section in the following ways:

  • No grant.
  • Percentage of total cost. Represents the proportion covered by the grant. For example, if you indicate 60 % and the total cost is 10,000 €, the grant received will be 6,000 €.
  • Total amount. Represents the total amount of the grant. For example, if you indicate 10,000 €, the grant for the installation will be 10,000 €.
  • Amount per size. Represents the grant per each peak watt (Wp) unit. For example, if you indicate 0.6 €/Wp in a 10 kWp installation, the total grant will be 6,000 €.

With all grant options, you can specify the delay in months between the payment of the installation and the receipt of the grant.

If you define a grant, your client will be able to visualize in the proposal the total cost of the project, the grant amount, and the project cost after deducting the grant.

INFO

The grant you define will affect the cash flows of the simulation, both in EPC mode and in PPA mode.